Maintenance
Ice ops & refrigeration
Ice operations
Maintenance control
Resurfacing cadence, ice-plant telemetry, and active work orders for both sheets.
Floods today
4
2 done · 2 queued
Ice depth
1.4 in
target 1.0–1.5
Refrigeration
Watch
Comp B 184 A
Open WOs
5
1 P1 · 2 P2 · 2 P3
Main SheetNext
Flood · Op Simmons
18m
10:18
Practice
Edge Detail · Op Vela
1h 30m
11:30
Main Sheet
Flood · Op Simmons
2h 00m
12:00
Main Sheet
Flood · Op Simmons
4h 30m
14:30
Practice
Full Cut · Op Vela
6h 00m
16:00
Main Sheet
Flood · Op Simmons
8h 00m
18:00
Resurface queue · next 6
Live · auto-refresh 60sMain Sheet
Flood
18m10:18
Op · Simmons
Practice
Edge Detail
1h 30m11:30
Op · Vela
Main Sheet
Flood
2h 00m12:00
Op · Simmons
Main Sheet
Flood
4h 30m14:30
Op · Simmons
Practice
Full Cut
6h 00m16:00
Op · Vela
Main Sheet
Flood
8h 00m18:00
Op · Simmons
Ice plant telemetry · last 60 min
Full IoT →Brine Temp
12.4 °F
Target 11–14°F
Header Pressure
62 psi
Target 58–66 psi
Compressor B Load
184 A
Watch · ceiling 195 A
Dehumidifier
41 %RH
Target ≤ 45 %RH
Work orders
| Pri | Title | Asset | Assignee | Opened | SLA | Status |
|---|---|---|---|---|---|---|
| P1 | Compressor B drawing elevated amperage | Compressor B | J. Vela | Today · 09:42 | 4h | In Progress |
| P2 | Dasher board panel B-14 loose | Dasher Boards — Main | R. Simmons | Today · 06:18 | 24h | Open |
| P3 | Scoreboard digit 4 intermittent | Scoreboard — Main | A. Knight | Oct 9 · 17:30 | 168h | Waiting Parts |
| P3 | Locker Room 3 — door closer adjustment | Locker Room 3 | R. Simmons | Oct 10 · 11:00 | 72h | Done |
| P2 | Zamboni 552 — blade resharpen | Zamboni 552 | R. Simmons | Oct 8 · 22:00 | 48h | Done |
| P3 | HVAC RTU-3 dirty filter alarm | HVAC Roof Unit 3 | A. Knight | Today · 07:15 | 72h | Open |
| P2 | Restroom 2 — sink leak | Restroom 2 | R. Simmons | Today · 08:50 | 8h | In Progress |
| P3 | Skate sharpener calibration | Pro Shop Sharpener | M. Chen | Oct 11 · 16:00 | 168h | Open |